Combining Sys-Tek’s engineering expertise with our field testing capabilities, we prepare studies for our clients that provide needed information to budget capital upgrades and assess equipment reuse. We prepare energy studies for many of our clients and assist them in establishing energy upgrades over several budget years.
Our experience preparing professional reports as a result of our engineering studies has included campus-wide electrical testing, where we thermal scanned all equipment greater than 400 amps for a major university. Reports were prepared for each individual building, providing an assessment of the necessary equipment upgrades, and probable cost to implement needed upgrades. Another similar report was prepared for a chilled water system serving a campus that included over 1-million square feet of pharmaceutical production. The final report included a 5-phase master plan for upgrading the chilled water systems with probable cost, along with energy savings for each phase. The client has implemented 3 of the 5 phases. Other studies have included demand ventilation control and equipment performance assessments for various clients.