OLDER POSTS

Bass Pro Shops – Data Center Expansion

Bass Pro Shops Data Center Expansion Springfield, Missouri This was a data center expansion project for an existing facility used to verify checks and credit cards that are used throughout the country at different Bass Pro Shop facilities. The existing data center was on a raised floor, using down flow…

Read more
Captive Plastics – Process Cooling

Captive Plastics Process Cooling Piscataway, New Jersey The scope of this project had two primary objectives. The first objective was to validate the process cooling requirements for the facility & develop recommendations for increasing capacity & redundancy. The second phase of the project was to provide design and construction services…

Read more
DST Systems, Inc. – Generator Plant Evaluation & Upgrade

DST Systems, Inc. Generator Plant Evaluation & Upgrade For this project, we first completed a detailed engineering evaluation to determine upgrades and modifications that could be made to the 5,000 kW engine generator plant to improve performance and efficiency. Our engineering analysis included system testing each of the five generators…

Read more
Lee’s Summit Technical Campus Townsend Capital – Utility Separation

Lee’s Summit Technical Campus Townsend Capital Utility Separation sys-tek completed a utility separation project for the Lee’s Summit Technical Campus located at the corner of 291 Highway and I-470, in Lee’s Summit, Missouri. This project involved separating the North and South buildings of the campus, one million square feet, into…

Read more
State Street Disaster Recovery Facility – TAB and Commissioning

State Street Disaster Recovery Facility TAB and Commissioning The scope for this project included performing integration and commissioning of all mechanical and control systems for the existing data center. Services included commissioning of the chilled water systems serving the DR area, computer room, and support area. They also included cooling…

Read more
Target Corporation – Consulting Engineering & Commissioning

Target Corporation Consulting Engineering & Commissioning Brooklyn Park, Minnesota sys-tek provided engineering consulting, recommendations, and commissioning on behalf of Target. This was to achieve a Leading Edge Data Center to support their commercial business requirements. To understand business requirements & determine the infrastructure necessary to support those requirements, we attended…

Read more