AT&T Houston Flood Project Sheet

Mission Critical Commissioning AT&T Toll Building Flood Restoration Location: Houston, Texas Overview This project is an example of our ability to respond on an emergency basis. On June 9, 2001, Houston received over 14-inches of rain within a 24-hour period which took one of AT&T’s 660,000 square foot critical communication…

Read more
AT&T – Jefferson Toll Building-4th and 5th Floor National Technology Center

AT&T Jefferson Toll Building – National Technology Center Scope of Work sys-tek provided engineering design for replacement & upgrade for the building chilled water system. That included the replacement of two (2) chillers with new 750-Ton chillers and the upgrade of piping distribution systems. Upgrades for chiller plant systems will…

Read more
ABN AMRO – Critical Facility Commissioning

ABN AMRO Critical Facility Commissioning Chicago, Illinois The project included commissioning a new data center for a 30-story building located in Chicago, where floors 3, 4, and 5 were used for the data center. The project included 80,000 square feet of raised floor for the data center. The mechanical and…

Read more
AT&T – Toll Building-Data Center

AT&T Toll Building – Data Center Kansas City, Missouri As prime consultant for this project, we developed and coordinated a $4,500,000.00 computer room expansion and upgrade project. The project was divided into two phases where the first phase included 15,000 square foot data center expansion. The second phase of the…

Read more
AT&T – Toll Building-HVAC Upgrade

AT&T Toll Building – HVAC Upgrade Kansas City, Missouri This project included engineering design to install a new 75,000-CFM air-handling system on a live equipment floor, requiring continuous operation of the existing HVAC air handling and distribution systems. We developed a detailed construction phasing plan to insure existing HVAC systems…

Read more
AT&T – Wireless Expansion

AT&T Wireless Expansion San Antonio, Texas This project included design and construction services for the complete renovation of an existing equipment space for a new telephone switch to support cellular services. The project included the installation of a new 40,000 CFM air handling & duct distribution, DDC control systems, lighting,…

Read more
AT&T – Renovation and Equipment Upgrades

AT&T Renovation and Equipment Upgrades Wichita, Kansas The facility, originally constructed in the late 30’s as a two-story building and later expanded in the 60’s as a four-story building, was primarily used to support office personnel prior to AT&T purchasing the building. Under this project, we provided program development, design,…

Read more
AT&T – Design, Operation, and Recommissioning

AT&T Design, Operation, and Recommissioning Houston, Texas Since 1985, one of the Principals of sys-tek has completed several projects for this 3,200-ton chiller plant serving a 660,000 square-foot telecommunication facility. The plant operation is extremely critical and in the many years that we have been working in this plant, we…

Read more