OLDER POSTS

Sarnoff Research Center – Chiller Plant Upgrades

Sarnoff Research Center Chiller Plant Upgrades Under this project, an energy upgrade program was designed and implemented which included fuel switching 1500 tons of chilling capacity to direct-fired (natural gas) absorption cooling and the installation of a waterside economizer utilizing a flat-plate heat exchanger. The waterside economizer provides 800 tons…

Read more
Sanofi-Aventis – Allegra D 24 Pan Coater System Installation

Sanofi-Aventis Allegra D 24 Pan Coater System Installation sys-tek provided mechanical, electrical, plumbing, and fire protection/alarm engineering services with construction administration support to the general contractor (McCown Gordon) for this design-build project. The project consisted of modifications to the Beads area on the 2nd Level of Building ‘C’ to provide…

Read more
Sanofi-Aventis – Heating Hot Water System Upgrades

Sanofi-Aventis Heating Hot Water System Upgrades Scope of Work The scope of work included analysis and redesign of the existing hot water heating system to improve control of the hot water system, to increase efficiency, and improve system distribution. The existing facility was a constant volume hot water system which…

Read more
Sanofi-Aventis – Engineering Design, Commissioning and Construction Services

Sanofi-Aventis Engineering Design, Commissioning, and Construction Services Project Scope The scope for this project included design and installation of four (4) 300 BHP high-pressure steam boilers, two (2) 1800-TON centrifugal chillers and relocation of one (1) 2000-TON to a new central plant. Chiller plant design included six (6) 1000-ton cooling…

Read more
Boehringer Ingelheim Vetmedica, inc. – Lab Renovation

Boehringer Ingelheim Vetmedica, Inc. Lab Renovation – St. Joseph, MO The purpose of this project was to renovate approximately 9500 square feet of pharmaceutical laboratory and office space for Boehringer Ingelheim Vetmedica, Inc. (BIVI). The existing 40+ year old facility featured very limited ceiling plenum space, and HVAC systems were…

Read more
Boehringer Ingelheim Vetmedica, inc. – Fermentation Expansion

Boehringer Ingelheim Vetmedica, Inc. Fermentation Expansion Boehringer Ingelheim Vetmedica, Inc. (BIVI) manufactures aerobic and viral antigen vaccines in its Biological Production Facility (Building B). BIVI has a new, wildly successful product called PCV2 that is grown in a fermentation using insect cells. As BIVI sees an immediate worldwide need for this…

Read more
Boehringer Ingelheim Vetmedica, inc. – Packaging Room Renovation and Expansion

Boehringer Ingelheim Vetmedica, Inc. Packaging Room Renovation and Expansion This project renovated and expanded an existing secondary packaging room to support a new automated animal health biological and pharmaceutical packaging line at Boehringer Ingelheim Vetmedica, Inc. (BIVI) in St. Joseph, Missouri. The building housed the existing Packaging Room and an…

Read more
Boehringer Ingelheim Vetmedica, Inc. – Chiller Plant Upgrades

Boehringer Ingelheim Vetmedica, Inc. Chiller Plant Upgrades sys-tek provided multiple engineering and commissioning services for the Boehringer Ingelheim Chiller Plant located in Ft. Dodge, Iowa. Based on the engineering study and Master Plan that we completed, we developed installation drawings and specifications that clearly illustrate the requirements for this project.…

Read more