OLDER POSTS

Bayer Cropscience – Formulation Pilot Plant

Bayer Cropscience Formulation Pilot Plant This project scope included building-out a 1500 square foot laboratory, installing a new eight foot fume hood, and providing exhaust systems with HEPA filtration, make-up air supply, pressurization, & temperature control. We provided mechanical consulting engineering services, project management, site supervision, testing & balancing, and…

Read more
Bayer Cropscience – Sencor HVAC Upgrade

Bayer Cropscience Sencor HVAC Upgrade $620,000 Turn-key Design/Build bid project required assembling a construction team based on a preliminary design prepared by our Engineering Division prior to being awarded the project. Engineering services included detailed mechanical and electrical engineering as well as process control engineering. Construction services included on-site supervision,…

Read more
Independence Regional Ennovation Center – IREC System Restart and Restoration

Independence Regional Ennovation Center IREC System Restart and Restoration The Independence Regional Ennovation Center (IREC) is intended to become the Kansas City area’s first viable small business & laboratory incubator facility, and place where entrepreneurs & innovations converge to develop new & exciting high tech businesses. IREC will become the…

Read more
North Kansas City Hospital – Electric Boiler Installation

North Kansas City Hospital Electric Boiler Installation This project was commissioned to help NKCH reduce energy waste and to slow the growth of energy consumption. For each initiative, the return on investment (ROI) and net present value (NPV) was calculated for a 15 year period, using a 5% opportunity cost…

Read more
North Kansas City Hospital – Electrical Testing & Upgrade

North Kansas City Hospital Electrical Testing & Upgrade North Kansas City Hospital (NKCH) was established in 1958, with the opening of its 80-bed patient facility. Today, the hospital encompasses 72 acres and is the busiest hospital in the Kansas City metro area. With over 550 physicians in 45 medical specialties,…

Read more
North Kansas City Hospital – Engineering Program Analysis

North Kansas City Hospital Engineering Program Analysis Under this project, we performed an in-depth engineering analysis of the chiller and piping distribution systems serving the hospital. The project objective was to determine the current state of operation and to develop a master plan that could be implemented, going forward as…

Read more
North Kansas City Hospital Health Services Pavilion Retro-Commissioning

North Kansas City Hospital Health Services Pavilion Retro-Commissioning The North Kansas City Hospital retained sys-tek to evaluate the HVAC systems serving the operating rooms as they were experiencing issues with low humidity. sys-tek performed retro commissioning services from April 26 through April 28, 2011. The retro commissioning included testing of…

Read more
Quintiles – Stability Storage Facility

Quintiles Stability Storage Facility The scope of the project was to reproduce the stability storage space from Buildings ‘A’ and ‘C’ at Aventis into the Quintiles Building ‘L’ second floor. A minimum of four chamber manufacturers were interviewed by the design team and selected to bid this turnkey operation. The…

Read more