Sanofi Aventis Utility Separation Project Sheet

Life Sciences Engineering & Commissioning Sanofi – Avnetis Engineering Design, Cx & Construction Location: Kansas City, Missouri Scope of Work Scope for this project included design and installation of four (4) 300 BHP high-pressure steam boilers, two (2) 1,800-TON centrifugal chillers and relocation of (1) one 2,000-TON to a new…

Read more
BIVI Chiller Upgrades Project Sheet

Life Sciences Engineering & Commissioning Boehringer Ingelheim Vetmedica Inc Chiller Plant Upgrades Total Cost: $285,000 Project Duration: March 2011 to April 2013 Location: Fort Dodge, IA sys-tek provided multiple engineering and commissioning services for the Boehringer Ingelheim Chiller Plant located in Ft. Dodge, Iowa. Based on the engineering study and Master…

Read more
Bayer Corpscience Formulation Pilot Plant Project Sheet

Life Sciences Engineering Bayer Corpscience Formulation Pilot Plant This project scope included building-out a 1,500 square foot laboratory, installing a new eight foot fume hood, and providing exhaust systems with HEPA filtration, make-up air supply, pressurization, and temperature control. We provided mechanical consulting engineering services, project management, site supervision, testing…

Read more
North Kansas City Hospital Energy Upgrades Project Sheet

Life Sciences Engineering & Commissioning   North Kansas City Hospital Building 1&2 CO2 Energy Upgrades Total Cost: $300,000 Project Duration: January 2011 to August 2012 Location: North Kansas City, MO Size: 451 Bed Facility, 69 Acre Campus (more…)

Read more
Ameripath Laboratory – Lab Renovation and Build-Out

Ameripath Laboratory Lab Renovation and Build-Out This project included the renovation & build-out of an existing vacant office for a new pathology laboratory facility and supporting administrative offices. The client is a leading national provider of physician-based, anatomic pathology services. sys-tek approached this project practically and economically while complimenting the…

Read more
Multiple Projects – New Construction, Renovation & Upgrades

Multiple Projects New Construction, Renovation & Upgrades University of Wisconsin – Veterinary Medical School The project experience included MEP design for Veterinary Medical Facility. The design included both small & large animal holding, surgical suites, and laboratories. The small animal holding included dog runs, rabbit, and rodent holding. The MEP…

Read more
Aventis Selectide – HVAC Upgrade and VAV Conversion

Aventis Selectide HVAC Upgrade and VAV Conversion This 28,000 GSF chemistry & biology laboratory building was originally designed for constant volume airflow. It is supported by 46 separate fume hoods of varying sizes, with an additional 50 plus ventilated enclosures. Under this project, we performed an extensive engineering study which…

Read more
Aventis Selectide – Biology Automation Relocation

Aventis Selectide Biology Automation Relocation Relocation of an existing robotics-based biology research laboratory and its associated radio-isotope laboratory. This was completed as part of an overall reconfiguration of the robotics laboratories at the facility. Utilities to the labs included compressed air, nitrogen, de-ionized water, vacuum, commercial, and UPS-protected power. Included…

Read more