Life Sciences Engineering & Commissioning Fort Sam Houston Brooke Army Medical Center Chiller Design Review & Commissioning Reference: J&J World Wide Services Lee Greenwood (210) 662-7035 Project Duration: April 2011 – October 2011 Size: 1,500,000 SQUARE FEET Cost: $12,000,000 sys-tek was hired to provide engineering review and analysis as well as…
Read moreLife Sciences Commissioning St. Joseph Medical Center AHU #6- 2nd Floor Surgery RCx Retro-commissioning Location: Kansas City, Missouri The purpose of this project was to perform retro-commissioning on Air Handling Unit #6 which feeds the OR suites on the 2nd floor of the hospital. As part of this process overall…
Read moreLife Sciences Engineering Bayer Corpscience Formulation Pilot Plant This project scope included building-out a 1,500 square foot laboratory, installing a new eight foot fume hood, and providing exhaust systems with HEPA filtration, make-up air supply, pressurization, and temperature control. We provided mechanical consulting engineering services, project management, site supervision, testing…
Read moreLife Sciences Engineering & Commissioning North Kansas City Hospital Building 1&2 CO2 Energy Upgrades Total Cost: $300,000 Project Duration: January 2011 to August 2012 Location: North Kansas City, MO Size: 451 Bed Facility, 69 Acre Campus (more…)
Read moreAmeripath Laboratory Lab Renovation and Build-Out This project included the renovation & build-out of an existing vacant office for a new pathology laboratory facility and supporting administrative offices. The client is a leading national provider of physician-based, anatomic pathology services. sys-tek approached this project practically and economically while complimenting the…
Read moreMultiple Projects New Construction, Renovation & Upgrades University of Wisconsin – Veterinary Medical School The project experience included MEP design for Veterinary Medical Facility. The design included both small & large animal holding, surgical suites, and laboratories. The small animal holding included dog runs, rabbit, and rodent holding. The MEP…
Read moreAventis Selectide HVAC Upgrade and VAV Conversion This 28,000 GSF chemistry & biology laboratory building was originally designed for constant volume airflow. It is supported by 46 separate fume hoods of varying sizes, with an additional 50 plus ventilated enclosures. Under this project, we performed an extensive engineering study which…
Read moreAventis Selectide Biology Automation Relocation Relocation of an existing robotics-based biology research laboratory and its associated radio-isotope laboratory. This was completed as part of an overall reconfiguration of the robotics laboratories at the facility. Utilities to the labs included compressed air, nitrogen, de-ionized water, vacuum, commercial, and UPS-protected power. Included…
Read more