University of Missouri – HSB Phase 1 Animal Health & Shell Space

University of Missouri HSB Phase 1 Animal Health & Shell Space Build Out Commissioning sys-tek performed System Commissioning. The project included two separate phases. The initial phase dealt with Commissioning of the new Animal Health Lab space. The second phase was Commissioning of new Lab/Office build outs on five floors…

Read more
University of Missouri – Electrical Systems Upgrades

University of Missouri Electrical Systems Upgrades Preliminary Assessment In 2007, sys-tek conducted an electrical infrastructure evaluation on over 250 units of electrical distribution equipment in 24 buildings within the UMKC system. The intent of this study was to visually assess all electrical equipment over 400A to ascertain its long-term viability,…

Read more
University of Missouri – Miller Nichols Library – Retro-Commissioning

University of Missouri Miller Nichols Library Retro-Commissioning The overall goal of this project was to test & adjust existing control and HVAC systems to increase performance & reliability to meet the operational needs of the facility. Through the retro-commissioning process, we identified needed repairs and consulted directly with the University…

Read more
University of Missouri – Student Union Enhanced LEED Commissioning

University of Missouri Student Union Enhanced LEED Commissioning Owners Performance Requirements Prior to this project being released for RFP to Design/Build Contractors, we developed the Owner Performance Requirements for the facility mechanical and electrical systems. These requirements established the minimum criteria for sizing equipment and equipment selection, including construction standards…

Read more
University of Missouri – Columbia : College of Veterinary Medicine Renovation and HVAC Upgrade

University of Missouri – Columbia College of Veterinary Medicine Renovation and HVAC Upgrade The Veterinary Medicine Building houses teaching facilities for the departments of Veterinary Biomedical Sciences and Veterinary Pathobiology. The project included the complete renovation of approximately 4,300 square feet of classroom space into research laboratories. The laboratories, including…

Read more